Updated September 2026

What it is

Xtrata, formerly Strata, makes SABS, a patented prefabricated panel wall system, in a factory in Arizona. General contractors and developers liked the system once they saw it installed, and the factory had real capacity.

The company reached Fowler through a third party bringing people with construction reputations into the business. The seat opened as lead generation through his builder and developer relationships, with LÏEF Development pricing and bidding installation on the jobs that came in. It grew into a year-long seat across sales, marketing, pricing, brand and go-to-market, with collateral addressing six kinds of work: industrial, quick-service restaurant, hospitality, multifamily, office and education.

What Common Ground did

Results

External links

Public record

Stories from this work

Holding the bid back to control how it landsXtrata's broker asked me to bid the shell for a 6-plex project for one of their clients, and the scope shifted twice before I could finalize a number.Insider truth Two versions of the same bidA trucking company needed a construction bid to hand to their lender, while our own internal estimate was still mid-review with the project architect and the Strata subcontractor hadn't even been engaged on that portion Insider truth Building the pricing model instead of trusting the gutLIEF's bidding relationship with a patented prefab wall-system manufacturer had grown into a real pipeline.Insider truth Narrowing the bid on purpose, then catching your own math errorAn early bid for a new Filiberto's location went out as a full general contractor number, off a plan set that was only three sheets, no structural or mechanical drawings behind it at all.Mistake and repair Turning a free trial into skin in the gameKyle Barichello, VP of Operations at Xtrata, ran a three project trial on our takeoff work, and speed was part of what he was scoring.Pivot The pipeline was lying to usOur project trackers were showing statuses, bidding, awaiting funding, that didn't match reality anymore.Mistake and repair Sending a bid you can't sign yetThe structural bid for a roughly 32,000 square foot project was ready, but there was no engineering behind the structure yet.The honest call Building a scoreboard to solve a people problemProject information was scattered across disconnected trackers, no shared picture of what the team was actually working toward.Teaching moment

At a glance

Project typeGo-to-market strategy and sales system design
IndustryBuilding products and construction technology
SeatFractional CRO and construction consultant
Ran throughCommon Ground, with the bid work through LÏEF Development
Dates2025 to present
DurationOngoing since 2025
LocationArizona
Public data roomXtrata Consulting Seat data room
Related pagesXtrata, Lïef Development + Construction, Common Ground
CreditCreated by Common Ground